Many mid-century Modesto homes still run on undersized panels. We upgrade main panels for homeowners adding solar, a battery, an EV or a heat pump, or replacing an unsafe panel.
A 1950s–1970s home often has 60- to 100-amp service. Add central AC, an EV charger and solar, and the panel can’t safely carry the load or accept the solar connection. A 200-amp upgrade, or a panel designed for solar and storage, solves that.
Local know-how
What's involved
We size the upgrade, pull the City of Modesto or Stanislaus County permit, and coordinate the service disconnect with MID or PG&E. If you’re going solar, we fold the upgrade into the same project and permit set where possible.
Our work
Built by our own crew. Supported for years after.
Every system is designed, permitted and installed by Clear Solar Solutions’ in-house team from our Turlock headquarters. No subcontracted crews, and the people who built your system are the ones you call for service.
“After struggling with electrical issues in my solar system, their dedicated crew came to the rescue when no one else would. Not only did they promptly address the problem, but they also got my system up and running smoothly again.”
Jeff D.
Google review
★★★★★
“We needed a new roof, main panel upgrade as well as a solar installation. Clear Solar Solutions was the option that we chose. Victor was with me on this project every step of the way. … I am super pleased with the quality of the work.”
Timothy B.
Google review
★★★★★
“The CSS team was absolutely amazing while installing my solar solution. There was an unplanned snag in the electrical, and they worked closely with my advocate to resolve the issue, resulting in minimum delay. The team was attentive and very friendly.”