Farms in the Merced Irrigation District service area face demand charges tied to the highest 15-minute load in each billing period, and Merced ID’s export credits can’t offset demand charges. On those accounts, battery storage or load scheduling alongside solar can matter as much as panel count. Westside farms around Los Banos are typically on PG&E, where ag rate schedules and solar programs differ. We confirm your utility for each meter before designing.