Turlock based. Built around your utility.

Your utility.
Your energy plan.

Solar, batteries and electrical upgrades shaped by how your property uses power, and how your electric utility bills it.

TID · Modesto · Merced · Lodi Electric · SMUD · PG&E

One local team

From your electric bill
to a working energy plan.

Homes · Businesses · Agriculture · New construction

Headquartered in Turlock

Serving California since 2015

C-10 electrical contractor

CSLB #1014016

Solar + storage + electrical

One coordinated project

Local power. Local knowledge.

Your electric provider.
Your starting point.

Select your utility to see published fees, ongoing charges and the way solar is credited. Start with the account’s actual rate plan.

Residential cost snapshots

These are utility charges. Your complete CSS project quote also accounts for solar and battery equipment, installation, permits and any electrical or utility upgrades. Commercial and agricultural rates need a separate review.

Turlock & surrounding electric service areas

TID

Know the charges.
Control the peaks.

TID solar can offset energy use within monthly time-of-use periods. Your highest grid-demand interval remains a separate part of the bill.

Where solar can work well

Households with substantial daytime use and a plan to manage import peaks. Compare solar alone with storage or load scheduling using interval data.

Turlock Irrigation District

2026 residential DG example

One-time utility fee

$450

Residential solar application. An optional generation meter is listed at $600; additional inspections may cost extra.

Monthly base charge

$26/mo

2026 customer charge. Standard non-solar DE service also has a $26 customer charge.

Demand charge

$3.40–$4.00/kW

Winter / summer, based on the highest 15-minute grid import. Energy and surcharges are additional.

Solar export treatment

TOU netting

Monthly on/off-peak netting; remaining net surplus is paid at the published variable SRMC.

A 10 kW summer peak adds $40.

At $4 per kW, a 10 kW maximum imported demand produces $40 of demand charges. Add the $26 customer charge: $66 before energy, surcharges and taxes. This is an illustration, not a predicted bill.

Worth checking. 2026 DG energy prices are 6.22–12.94¢/kWh by season and time. A battery must actually reduce the monthly maximum imported kW to reduce demand charges.

Checked October 22, 2026. These are published residential examples. The linked tariff, approved account and configuration control eligibility.

Electric customers of Modesto Irrigation District

Modesto

Use more solar
on your own site.

Modesto’s NEM 2 pays a set credit for excess generation. Solar used at home can avoid a retail purchase instead.

Where solar can work well

Homes and businesses that can use a substantial share of solar as it is produced. Review approved expansion size and battery settings before adding equipment.

Modesto Irrigation District

Residential D + Modesto NEM 2 example

One-time utility fee

$900

Interconnection below 100 kW AC CSI per meter. At 100 kW or more the listed fee is $1,800.

Monthly base charge

$32/mo

Standard Residential D fixed charge, also paid without solar. Eligible CARES accounts have a reduced charge.

Base energy range

15.279–21.349¢

Per kWh on the published residential tiers, depending on season and use. Adjustments and taxes are extra.

Solar export treatment

7.6¢/kWh

Modesto NEM 2 excess-generation credit. Imported and exported energy are tracked separately.

1,000 eligible exported kWh earns $76.

At 7.6¢ per kWh, 1,000 kWh of compensated excess generation creates a $76 credit. Solar consumed on site instead reduces retail energy purchases. This credit example is not total system savings.

Worth checking. Modesto’s NEM 2 tariff excludes excess-generation compensation for customers with grid-charged battery storage. Confirm the approved charging configuration before comparing storage options.

Checked October 22, 2026. These are published residential examples. The linked tariff, approved account and configuration control eligibility.

Electric customers of Merced Irrigation District

Merced

Energy savings.
Peak-demand planning.

Merced’s July 2026 residential NEM 2 rate includes demand billing. Solar production and the timing of your highest grid use both matter.

Where solar can work well

Customers with daytime solar use and a practical way to manage large evening or simultaneous loads. Compare solar with controlled storage and load scheduling.

Merced Irrigation District

Residential NEM 2 · effective July 1, 2026

One-time utility fee

$600

Residential application fee. Nonresidential applications are listed at $1,200; other project costs can apply.

Monthly base charge

$30/mo

Minimum customer charge under the July 2026 residential NEM 2 rate. This replaces the older $65 amount.

Demand charge

$5.19–$8.19/kW

Winter / summer, based on the highest 15-minute district-supplied load each billing period.

Solar export treatment

4.95¢/kWh

Published excess-generation credit in the July 2026 tariff. Credits do not offset demand charges.

A 10 kW summer peak adds $81.90.

10 kW × $8.19 produces $81.90 of summer demand charges. With the $30 customer charge, that is $111.90 before energy, adjustments and taxes. Solar credits cannot cancel the demand charge.

Worth checking. Published base energy is 13.88¢/kWh, with adjustments and mandated charges additional. Review interval data: an evening peak can remain even when solar covers much of the day’s energy.

Checked October 22, 2026. These are published residential examples. The linked tariff, approved account and configuration control eligibility.

Lodi Electric Utility customers

Lodi Electric

Keep more value
behind the meter.

Lodi’s Energy Purchase program credits exported solar. Solar used on your property reduces the electricity you need to buy.

Where solar can work well

Properties with recurring daytime loads that can use solar directly. Compare storage against the difference between avoided purchases and export credits, including ECA.

Lodi Electric Utility

Standard residential + Energy Purchase example

One-time utility fee

$839

Single-phase 60–200A metering/interconnection, July 2026–June 2027. Three-phase 200–400A: $1,479.

Monthly base charge

$19.50/mo

Standard residential customer charge per meter. This is an ordinary service charge, not a new solar fee.

Base energy tiers

14.28–33.66¢

Per kWh in the currently linked residential rate summary. Monthly ECA and taxes are additional.

Solar export treatment

8.43¢/kWh

Energy Purchase credit for exports, effective July 1, 2026–June 30, 2027.

1,000 exported kWh earns $84.30.

At the current 8.43¢ Energy Purchase rate, 1,000 exported kWh creates $84.30 in credits. Energy consumed on site is neither billed nor credited. This is an export example, not an annual savings estimate.

Worth checking. Lodi’s current solar guide does not allow third-party electricity-sale PPAs. Financing-style equipment leases are allowed. Ownership and financing options need to fit that rule.

Checked October 22, 2026. These are published residential examples. The linked tariff, approved account and configuration control eligibility.

Sacramento-area SMUD customers

SMUD

Use solar now.
Plan for peak hours.

SMUD’s Solar and Storage Rate credits exports at a fixed rate. A battery can move available solar toward the weekday 5–8 p.m. peak window.

Where solar can work well

Solar owners who can shift use out of the evening peak, or qualify for a participating battery program. Review legacy NEM eligibility before accepting incentives.

Sacramento Municipal Utility District

Standard residential TOD + SSR example

One-time utility fee

From $475

Residential systems under 10 kW; 10–under 20 kW: $900. Adding a battery to existing solar has no additional fee.

Monthly base charge

$27/mo

Standard System Infrastructure Fixed Charge. A qualifying Low Use plan has a different charge.

Energy-rate range

12.85–37.65¢

Per kWh on current standard Time-of-Day rates, depending on season and time. Discounts may apply.

Solar export treatment

9.6¢/kWh

SSR export compensation, effective June 1, 2026, regardless of hour or season.

1,000 exported kWh earns $96.

At 9.6¢ per kWh, 1,000 SSR export kWh creates $96 in energy credits. Your standard fixed charge remains. Compare the complete solar-and-storage cost with expected energy savings.

Worth checking. Eligible battery interconnection applications received on or after September 23, 2026 can qualify for up to $6,000 in My Energy Optimizer Partner+ enrollment incentives. Eligible equipment, SSR participation and SMUD battery control are required; enroll within 90 days of PTO. Confirm the actual incentive and eligibility.

Checked October 22, 2026. These are published residential examples. The linked tariff, approved account and configuration control eligibility.

PG&E electric customers

PG&E

Higher energy value.
Smarter timing.

PG&E’s electricity prices can create substantial value for solar used on site. Storage and export timing shape the Solar Billing Plan case.

Where solar can work well

Customers with high avoidable energy costs and solar that matches their use. Compare storage for evening imports and valuable export periods using the actual tariff.

Pacific Gas and Electric Company

Bundled residential E-ELEC + Solar Billing example

One-time utility fee

$145

Standard NEM 2 / NBT interconnection request at or below 1 MW. Service or grid upgrades are separate.

Monthly base charge

About $24/mo

Base Services Charge, billed daily. About $6 CARE / $12 FERA or qualifying housing. Applies with or without solar.

Bundled energy range

28.468–55.214¢

Per kWh in the current E-ELEC bundled tariff, by time and season. CCA generation rates can differ.

Solar export treatment

Hourly value

Solar Billing export credits vary by month, hour and day type. They are not a fixed retail-rate credit.

100 summer off-peak kWh: $33.36.

At the published 33.358¢ E-ELEC bundled summer off-peak rate, avoiding 100 kWh of purchases is about $33.36 in energy charges. This illustrates one rate period, not annual savings or battery payback.

Worth checking. The Base Services Charge replaced the previous minimum-charge structure; do not add the old E-ELEC $15 charge again. Confirm original NEM status and remaining legacy eligibility before expansion.

Checked October 22, 2026. These are published residential examples. The linked tariff, approved account and configuration control eligibility.

Understand what remains on the bill. Base charges can apply with or without solar. Energy, demand, adjustments and taxes may remain after installation. Existing NEM and discounted accounts can have different terms. Modesto and Merced Irrigation Districts are separate utilities.

New-solar residential snapshots, checked October 22, 2026. Fees cover the stated project sizes and service types in each profile. Base charges are recurring service costs, not necessarily solar-specific charges. Legacy programs, discounts, larger projects and equipment changes can differ.

Utility fees and billing components; separate from installation cost
UtilityOne-time feeMonthly baseResidential demandExport / surplus treatment
TID$450$26/mo$3.40 winter / $4.00 summer per kWMonthly TOU netting; surplus SRMC varies
Modesto$900$32/moNot listed on standard Residential D7.6¢/kWh, subject to NEM 2 eligibility
Merced$600$30/mo$5.19 winter / $8.19 summer per kW4.95¢/kWh published excess-generation credit
Lodi Electric$839$19.50/moNot listed on standard residential schedule8.43¢/kWh through June 30, 2027
SMUDFrom $475$27/moNot listed on standard residential TOD9.6¢/kWh under SSR
PG&E$145About $24/moNot listed on residential E-ELECVaries by month, hour and day type

Application fees, base charges, demand and export credits measure different things. The lowest fee or highest export credit alone does not identify the lowest total cost or best solar payback.

The starting bill matters

Same usage.
Different starting costs.

Published monthly bill comparison · 750 kWh/month

  • PG&E
    $290
  • Modesto
    $175
  • SMUD
    $149
  • TID
    $139

Source: SMUD’s published comparison, June 1, 2026 ↗. This is a utility-bill benchmark, not a solar-savings or post-installation estimate. Merced and Lodi are not included in this source.

Understand the line items

What can remain
on a solar bill?

Look at the type of charge as well as the total. Each one responds to a different part of the energy plan.

kWh

Energy you buy

Grid power used when solar or stored energy does not cover the load. Time-of-use plans also price when you use it.

kW

Peak demand

On demand-billed plans, the highest grid load during the utility’s measurement interval matters. Lower total energy use can still leave a high peak.

$

Recurring service charges

Customer or infrastructure charges can remain with solar. Review the actual rate plan and any eligible discounts.

±

Solar export credits

The value of energy sent to the grid, and which charges credits can offset, depend on your approved solar program.

Use your own electric bill and agreement alongside the utility profile above.

Before equipment is selected

Plan the connection.
Know the next step.

Utility rules can affect the system size, approved equipment, cost and sequence of work. We review those details as part of the design.

01

Confirm the starting point.

Review the rate plan, existing solar approval and proposed changes. System-size limits, export rules and legacy eligibility can affect what the utility will approve.

02

Define the full connection scope.

An application fee covers the stated utility service. Permits, engineering, meter work or approved electrical upgrades can be separate. Confirm the requirements and responsibilities for your property.

03

Coordinate approval and closeout.

Building inspections and utility operating authorization have different roles. Some utilities require approval before installation. The sequence and final operating requirements follow your utility and project type.

Already have solar?

Start with the reason
for the bill.

New loads, import timing, ongoing charges or a production issue can each affect the result. Monitoring and billing history help us identify which one needs attention.

  • ↗Compare bills and production over the same period.
  • ↗Check new EV, HVAC or other electrical loads.
  • ↗Review the original solar program before expanding.

A useful place to start

Bring your bill.
We’ll bring the questions.

Build a short checklist for your conversation with CSS. No account numbers or personal details needed here.

This creates a checklist on this page. To reach our team, use the contact link or open an email draft after your checklist is ready.

Clear answers

Local questions.
Practical answers.

Start with the actual electric account, the property and the proposed work.

Yes. Local electric utilities have their own solar programs and interconnection requirements. We review the provider, rate plan and property before recommending a design.

No. A program name alone does not establish the billing rules. PG&E’s Solar Billing Plan, Modesto’s NEM programs, Lodi’s Energy Purchase program and SMUD’s Solar and Storage Rate need their own review.

It can. We review original approvals, legacy eligibility, proposed changes and any incentive conditions. Separate equipment alone does not preserve an existing utility arrangement; the configuration must qualify.

That depends on the utility and approved arrangement. Review each account and meter rather than assuming credits can move between properties. Pump schedules, seasonal loads and export treatment also affect the design.

No. The utility amounts are separate from solar panels, batteries, installation, permitting and any required electrical or grid work. CSS reviews the property and issues a project-specific scope and quote.

Compare the full picture: avoided electricity purchases, export treatment, ongoing charges, interconnection requirements and eligible incentives. A high export credit or a low application fee alone does not predict the best savings. Your profile shows the costs and value drivers to review.

Start with the electric-service section of your bill and the service address. Choose “Not sure” in the checklist and bring what you have. We’ll help identify the right starting point.

Local experience. A plan for your power.

Tell us your utility, your property and what you want to accomplish. We’ll help define a practical next step.